Summary of 2/14/09 Meeting
Meeting Recaps February 14th, 2009Today we did the following:
- Finished assembling the rollers
- Finally mounted the encoders
- Cut all the plastic to size
- Re-soldered and re-wired everything….again
- Ran into a problem with the left motor, but it was just a connection problem
- Started working on the driver station, and decided on a 2 layer station
- Mounted the second level of electronics (the bridge, and 2 jaguars)
- Made all the wires neater with zip ties
- Figured out a way to mount the slope so that the orbit balls will come up better
- Mounted the Fisher Price motor for the front roller, along with a sprocket, chain, bearings…
- Bought bright, neon orange spray paint for our team number on the bumpers
- Mounted two more triangular plates on the frame
Last Updated February 18, 2009